Coso Geothermal Development

California Energy Company, Inc.

 

RMT'S ROLE:

Prepared over 20 environmental documents, including PEAs, EAs, EISs, and joing federal/state documents for nine 25-MW power plant units, two transmission lines, and three exploration and development well fields. RMT performed the following services for the Coso Geothermal Development:

  • Coordinated involvement of three federal and four state permitting and responsible agencies
  • Prepared and facilitated consensus in interagency agreements to define and streamline permitting process
  • Prepared Plans of Exploraton, Development, Utilization, and Injection
  • Participated in power plant engineering and design studies to ensure environmental compliance and protection
  • Prepared transmission line routing alternatives studies
  • Developed and successfully implemented baseline data collection programs on over 16,000 acres
  • Collected baseline meteorological data
  • Prepared Field Environmental Compliance Manual
  • Prepared California Energy Commission Small Power Plant Exemption Application environmental sections, responded to data requests, and testified at public workshops and hearings
  • Assisted in air and water quality permitting
  • Developed and implemented successful fast-track permitting strategy
  • Conducted environmental audits of the geothermal field for the client and for China Lake Naval Weapons Center, verifying compliance with and effectiveness of operational conditions and mitigation measures

 

SIGNIFICANT ISSUES:

The project involved:

  • Permitting under accelerated schedules
  • Multiple agency coordination
  • Air quality
  • Application of new technology
  • Public educatoin
  • Effects on cultural resources
  • Effects on hot springs
  • Effects on threatened species
  • Land use conflicts
  • Native American concerns

QUICK FACTS:

Inyo County, California
NEPA/CEQA
9 25-MW Plants