RMT Energy | Construction
RMT Inc.

Fowler Ridge Wind Farm

BP Alternative Energy NA, Inc., and Dominion Resources, Inc

INTERCONNECTING UTILITY:

PJM Interconnection at American Electric Power's Dequine Substation

RMT'S ROLE:

  • Engineering and construction entire BOP
  • Two 34.5/345 kV 200-MW substations and interconnections, one 345 kV switchyard
  • Construction of operations and maintenance facility
  • 23-mile, 345 kV transmission line to interconnection

PROJECT HIGHLIGHTS:

  • Largest utility-scale wind energy facility in Indiana
  • Largest single contract wind turbine power generation facility in U.S. history, built in a construction window of just nine months
  • Managed complex interconnection for two new site substations to 345 kV transmission grid
  • Maintained project schedule despite being constructed during worst winter and spring weather in the last 80 years
  • Offered five local volunteer fire departments week-long training class on tower rescue
  • Provided ongoing energy, environmental, and economic benefits:
  • Generates enough electricity to power approximately 118,378 homes annually
  • Offsets the combustion of approximately 547,033 tons of coal per year, which reduces the equivalent of 720,000 tons of CO2 emissions to the atmosphere annually
  • Provides income to local landowners through annual lease payments
  • Employs more than 12 full-time workers after completion

QUICK FACTS:

Benton & Tippecanoe Counties,
Indiana
400 MW
182 Vestas V82 1.65-MW
Turbines
40 Clipper C96 2.5-MW
Turbines