Harvest Wind Farm

John Deere Renewables LLC

INTERCONNECTING UTILITY:

Interstate Transmission Company

RMT'S ROLE:

  • Provided complete siting and development services, including:
    • Fatal flaw analysis
    • Concept development, meteorological data review, and energy production assessment
    • Ecological, environmental, and historical assessments
    • Local, state, and federal permitting
    • Shadow-flicker analysis, noise evaluations, and microwave interference evaluations
    • Setback requirements and land use approvals
    • MISO interconnection study and negotiation support
  • Prepared civil infrastructure design, including transportation logistics for turbine delivery
  • Completed geotechnical investigations and designed turbine foundations
  • Performed engineering and construction of civil and electrical system BOP
  • Completed erection and in-tower wiring of turbines
  • Designed and constructed the 34.5-kV collector system and 19 miles of fiber optic communication system and SCADA network
  • Designed and constructed 34.5 kV-120 kV substation
  • Constructed 10.2 miles of access roads, 26.5 miles of underground collector trenches, and 5,000 feet of directional boring

PROJECT HIGHLIGHTS:

  • First commercial-scale wind farm built in the State of Michigan
  • Developed good working relationships with local labor unions, enabling union and nonunion staff to work side-by-side
  • Provides ongoing energy, environmental, and economic benefi ts to the local community:
    • Generates enough electricity to power approximately 13,900 homes annually
    • Offsets the equivalent of 127,000 tons of carbon dioxide emissions to the atmosphere annually
    • Creates additional income from both sales tax and property tax increases, benefi ting both local and state coffers
    • Provides income to local landowners with a turbine site(s) on their property through annual lease payments

QUICK FACTS:

Huron County, Michigan
53 MW
32 Vestas V82 1.65-MW
Turbines