Locust Ridge I Wind Farm
Iberdrola Renewables, Inc.
INTERCONNECTING UTILITY:
Pennsylvania Power & Light (PPL Corporation)
RMT'S ROLE:
- Performed engineering and construction of civil roads and AG/UG electrical system BOP
- Performed rock anchor foundation construction
- Completed erection and in-tower wiring of turbines
- Designed and constructed 69/34.5 kV substation
- Designed and constructed 29 miles of underground 34.5-kV collector system and fiber optic communication system and SCADA network
- Upgraded and improved existing mine roads
- Designed and constructed 16 miles of access roads
PROJECT HIGHLIGHTS:
- First U.S. project for Iberdrola Renewables, Inc. (Locust Ridge I)
- Integrated PPL, PJM, and Iberdrola SCADA systems for monitoring and control from Spain
- Constructed unique rock anchor foundation designs
- Managed very challenging terrain
- Installed very elaborate erosion and sediment system for supporting infrastructure
- Provides ongoing energy, environmental, and
economic benefi ts to the local community:
- Generates enough electricity to power approximately 37,000 homes
- Offsets the equivalent of 230,000 tons of carbon dioxide emissions to the atmosphere annually
- Provides income to local landowners with a turbine site(s) on their property through annual lease payments
- Provided 120 local area residents jobs for approximately one year