Lost Creek Wind Farm
Wind Capital Group
INTERCONNECTING UTILITY:
Associated Electric Cooperative Inc.
RMT'S ROLE:
- Engineering design, procurement, and construction of civil and electrical system BOP
- Construction of access roads, crane pads, crane paths, and associated infrastructure
- Design and construction of spread-footing foundations
- 4.5 kV electrical collector system
- Erection and mechanical completion of 100
- GE wind turbine generators
PROJECT HIGHLIGHTS:
- Completed project two months ahead of baseline schedule
- Realized budget savings of $1.5M for client by managing contingencies
- Achieved zero Lost Time Accidents for 353 days worked
- Provided over five miles of upgraded roadways and drainage structures for the local community
- Constructed using 100% local union work force
- Largest wind energy facility in Missouri
- Generates enough electricity to power approximately 44,000 homes annually
- Offsets the combustion of approximately 205,000 tons of coal per year, which will reduce the equivalent of 270,000 tons of CO2 emissions to the atmosphere annually